Data Center : Three Phase UPS

The raised floor grommet are designed to seal openings in raised floor cutouts prior or after the installation of communications or power cabling. If the cutouts are not sealed, much of the valuable conditioned air in data center is not reaching the air intake of IT equipment. This lost air, known as bypass airflow, contributes to IT equipment hot spots, cooling unit inefficiencies, and increasing infrastructure costs. The grommets designed for raisled floor tile cut outs specifically address bypass airflow and its detrimental effects on data center cooling.

The grommet increases existing cooling unit capacity, reduces the need to purchase additional cooling units, improves equipment reliability and extends equipment life, increases static pressure under the raised floor and improves cool air delivery through perforated tiles and floor grates, facilitates Cold Aisle/Hot Aisle best practices.

Got Any Queries?

    Our Vendors

    About Topnet

    Over 4.5 million+ high quality stock images, videos and music shared by our talented community.

    Quick Links

    Dubai

    Topnet Distribution FZCO
    Warehouse Unit K-11, Dubai Airport Free Zone,
    PO Box 54791, Dubai, UAE

    Our Group Companies

    Topnet Distribution LLC
    B205, Auto Centre, B-Block, Plot
    # 367-0, Al Khabaisi, Deira
    Dubai, UAE

    KSA Office

    Topnet Communications and Information Technology
    Building no. 7960, Unit# 5, 18 St. Ibn, Khaldoun Area
    P.O. Box 2741-Dammam 32253
    Kingdom of Saudi Arabia

    Topnet © Copyrights 2024. Al Rights Reserved